Login   |   Register   |   

Places   (Help with places, streets and buildings in Wigan.)

Started by: jo anne (34721) 

From FOHCP's FB Page - link (includes photos):

"Work has now started on the first phase of the Swan Pond with the help of Graham Workman (WLCT).
Graham said, we have located the chain that operated the sluice system and repaired the mechanism which now works, and have started to drain the pond. We will be repairing the structure itself to fix the leaks around the brickwork; hopefully once this is done we can start on the next phase of the project."

Replied: 17th Jan 2015 at 15:54

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (52.14.253.170) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.