Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: Owd Codger (3182)

It would be very expensive to reopen the Woodhead line when not only the tracks have been taken up, the track partly built on and two of tunnels have been sealed with concrete while the other one is full of main power cables.

The mistake was made in closing the line, especially when it was a lovely ride along the Woodhead pass to Penistone and Sheffield pulled by one of the Class 76 or class 77 electric locomotives.

Replied: 27th Sep 2023 at 13:11

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (18.223.170.21) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.