Message Boards
Message Boards
Interact
Interact
General (General discussion, talk about anything.)
Started by: ena malcup (4151)
The 25kV catenaries would require much greater headspace than had been needed for the original 1.5kV DC catenaries used by the long lost Woodhead trains. I have read a number of times that it would cost more to upgrade Woodhead Tunnel than to bore a new facility. I do not know if such is true.
Replied: 26th Sep 2023 at 18:11