Message Boards
Message Boards
Interact
Interact
General (General discussion, talk about anything.)
Started by: gaffer (7982)
I posted this earlier on Places.
One of the reasons for the high cost is that HS2 was designed for trains running at 240 mph. On the longest stretch of the line the 90 miles from Old Oak Common to Birmingham the trains would have to slow down before reaching maximum speed.
It’s like Lansleys’ NHS bill, the MPs voted for it without understanding the details.
Replied: 26th Sep 2023 at 14:55