Ok your three were in the Big League, but can I comment as a humble council dwelling oink

Two big jobs done in my place over the years, a new kitchen and a new bathroom, years apart, but the jobs were designed in the same way, like clockwork, a choreographed procedure those lads had done hundreds of times, the bathroom lot had been putting in bathrooms for six years, on the same council contract.

So first crew come in and rip out the old bathroom suite, then a different crew remove the bathroom floor, separate crew take away old units, and rubbish, then another crew deliver the new units, and then Tom's mates the plumbers arrive and the fun starts, 1960s system built crap put in by monkeys, as they described the place.

Which means the plumbers have fun getting the new stuff to connect to the old plumbing, which is not that old really, but I suppose that is what plumbing is all about, it took two weeks for the job to be done, and they told me that they start between 7.30amand 8.00am in the morning, and the finish early on Fridays, in practice they arrived outside at between 7.30am and 8.00am getting their stuff ready, but they did not come in before 8.00am, and on that first two days, because of problems they encountered they did not leave until nearly 7.00pm, other wise I would have been in a bit of a mess.

So don't call those lads to me, even of they did bugger off at about 1.30pm on Friday, they worked bloody hard

Replied: 23rd Oct 2021 at 22:20

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.22.61.246) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.