Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: broady (inactive)

Tonker,
When I worked on the Mawdesley to Warrington pipeline British Gas had a guy full time looking for newts. He found one which the men had brought on site. Where they thought they were crossing we had to erect ultra violet sheeting so they wouldn’t get sunburn. We had to make ramps fully carpeted for them to cross. We were based at Gadbury Fold. I told the van driver to get some offcuts next time he was driving round. BG rejected them and insisted we use Axminster or Wilton carpet. I heard a figure of £1m mentioned as the cost of the exercise. We were cost plus so no problem to us.

Replied: 13th Jan 2021 at 19:58

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (54.163.200.109) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.