Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: chris southworth (632)

priscus, that is a completely different construction to a road. Aye it had several thousand 70m deep piles to support it, but they were in groups forming a pilecap every 25m under each support column. That is nothing exceptional, standard construction design. For a road you have to support the full width of the road along it's entire length so you would need a pile every 1m minimum across it's width and for every 1m of length. The Maglev cost $1.2billion to build. Wigan Council have only costed this short 1.8 Km road at £4.2 million and that is just for a standard 6m wide carriageway and footpath with no extras for unforeseen ground conditions.

Replied: 9th Aug 2017 at 09:40

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (18.117.189.7) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.