Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: fossil (7728)

Baker boy,I think the corporation works department dealt with housing and building works.
The Streets department dealt with roadworks and sewers and drains.
The Warrington road stretch from Marus bridge to the motorway island ,constructed about 1962 ,less than a mile in length took about 18 months to construct.

Replied: 3rd May 2017 at 21:23

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.142.197.212) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.